SourcingAI

Heavy excavator

I have found results from200000+products and100000+suppliers aboutHeavy excavator

Commonly Used:
US$
—
Customization Available
Sample Available
Manufacturer First
Product Attributes:
Type: Crawler Excavator
Type: Wheel Excavator
Usage: Special Excavator
Bucket: Backhoe
Transmission: Hydraulic Transmission
Bucket Capacity: >1.5m³
Size: Medium-Sized
Certification: CE
Condition: New
Track Shoe Width: 600 mm
5-10 Years Old
Internal Combustion Drive
Arm Length: 1.5 meters
Engine Power: 100 hp
Operating Weight: 10 tons
Usage: Marine Excavator
Usage: Mining Excavator
Usage: GM Excavator
Bucket: Grab Shovel
Bucket: Shovel
Transmission: Mechanical Transmission
Bucket Capacity: 1.0~1.5m³
1.2 cubic meters
0.5 cubic meters
Bucket Capacity: 0.5~1.0m³
Size: Large-Scale
Size: Small-Scale
Certification: ISO9001: 2000
Condition: Used
Track Shoe Width: 300 mm
Within the Last 5 Years
Year of Manufacture: Latest Year
Drive Type: Electric Drive
Engine Power: 150 hp
Operating Weight: 20 tons

Sourcing guidance for Heavy Excavator

What are the key technical specifications to evaluate when sourcing a heavy excavator?

When selecting a heavy excavator, the most critical factors are operating weight, engine power, and bucket capacity. For heavy-duty mining or large-scale construction, ensure the operating weight aligns with your soil density requirements. You must verify the engine brand and emission standards (e.g., Tier 4 Final or Stage V) to ensure local environmental compliance. Additionally, evaluate the hydraulic system pressure and flow rate, as these determine the machine's breakout force and cycle times. High-quality components from brands like Kawasaki or Rexroth are preferred for hydraulic pumps and valves to ensure long-term reliability.

How can I ensure the excavator meets international safety and quality standards?

B2B buyers should prioritize suppliers who hold ISO 9001 certification for manufacturing quality management. For the equipment itself, CE marking is mandatory for the European market, while ANSI/ASME standards are relevant for North America. Ensure the machine features a ROPS (Roll-Over Protective Structure) and FOPS (Falling Object Protective Structure) certified cabin to protect operators. Request third-party inspection reports (such as SGS or TÜV) to verify structural integrity and welding quality before the final payment.

What usage scenarios should dictate the choice of excavator configuration?

The configuration should match the specific application: for quarrying and mining, a short-boom 'mass excavation' configuration with a larger bucket is ideal; for deep trenching or demolition, a long-reach arm is necessary. If the project involves soft terrain, specify wider track shoes to reduce ground pressure. For urban construction, look for zero-tail swing models to operate safely in confined spaces. Always confirm if the supplier provides quick-hitch compatibility to allow for seamless switching between attachments like hydraulic hammers, rippers, or grapples.

Cross-Border Procurement & Logistics for Heavy Machinery

What are the primary risks in cross-border heavy machinery purchasing and how to mitigate them?

The biggest risks include equipment damage during transit and non-compliance with local emissions laws. To mitigate these, use Made-in-China.com's secured payment services to ensure funds are only released upon proof of shipment and inspection. Always purchase comprehensive marine insurance that covers 'All Risks' during sea freight. To avoid customs seizures, double-check that the Engine Serial Number and VIN match the documentation exactly, as discrepancies can lead to heavy fines or re-exportation.

What is the most cost-effective shipping method for heavy excavators to international destinations?

Heavy excavators are typically shipped via Ro-Ro (Roll-on/Roll-off) vessels or Flat Rack containers. Ro-Ro is generally the safest and most efficient for fully assembled units, as it minimizes handling. For smaller heavy excavators, disassembling the arm and bucket to fit into a standard 40ft High Cube container can significantly reduce freight costs, though it requires on-site reassembly expertise upon arrival. Always negotiate Incoterms like FOB or CIF clearly; for heavy machinery, FOB is often preferred by experienced buyers to maintain control over the specialized shipping lines used.

How should I negotiate after-sales support and spare parts availability with overseas suppliers?

Negotiate a 'Wear-and-Tear' spare parts package (filters, seals, teeth) to be included in the initial container to cover the first 2,000 hours of operation. Demand a minimum 12-month or 2,000-hour warranty on major components like the engine and main pump. Ensure the supplier can provide digital technical support via video calls and has a commitment to dispatching critical parts via air express (DHL/FedEx) within 48 hours to minimize downtime at the job site.

Related queries