Prefabricated integrated house
I have found results from100000+products and60000+suppliers aboutPrefabricated integrated house
Prefabricated Expandable Container House Flat-Pack Design for Prefab Office Dorm Living Room Bedroom-Modular Integrated Bathroom
Cost Effective Movable House Steel Structure Prefabricated Integrated House Customizable Tiny Home
Modular Prefabricated Container Apple Space Capsule Prefab House Factory Price Integrated Modern Vacation Homestay Tiny House
Prefabricated Mobile Apple Pod, Internet Celebrity Integrated House, Scenic Cabin, Outdoor Office/Duty Room, Landscape Commercial Exhibition Hall
China Low Price Prefabricated House Site Office Modular Flat Packed Container Integrated Housing
Demountable Prefab Prefabricated Container House ISO High Quality Modular Detachable/Flat Pack Integrated Home
20 Feet Stacked Integrated Prefabricated Container Living House
Prefabricated House Movable Steel Storage Container Luxury/Integrated Office Floor/Folding Expandable Container House
Broiler Farming Prefabricated Steel Chicken House with Integrated Ventilation Livestock Industry
Folding Modular Prefabricated Integrated Bathroom Container House for Living
17 Set 20FT 40FT Integrated Movable Tiny Mobile Flat Pack Prefab Prefabricated Container House Home
Security Trailer Container Prefabricated House on Wheel Building Prefab Integrated Movable Home Casa Contenedor
Factory Direct Quick-Assemble Integrated Fireproof Residential Mobile Home Modular Prefabricated 2 Storeys Villa Container House
Energy Efficient Integrated Mobile House with Modern Design and Prefabricated Structure
Multi Purpose Prefabricated Home with Convenient Sturdy Expansion Box for Global Markets Integrated House
Commercial Mobile Home Prefabricated Integrated House for Simple Network Celebrity Box Hotel Activity Tool Room
Tech-Integrated Prefabricated Eco-Friendly Intelligent Capsule House
Sourcing guidance for Prefabricated Integrated House
What are the key technical specifications to consider when selecting a Prefabricated Integrated House?
Buyers must prioritize the structural integrity and material durability. Ensure the main frame uses galvanized steel with a thickness of at least 2.5mm-3.0mm to prevent corrosion. For insulation, Rockwool or PU (Polyurethane) sandwich panels are preferred over EPS due to their superior fire resistance (Class A) and thermal efficiency. Additionally, verify the floor load-bearing capacity, which should typically be ≥200kg/m² for standard residential use.
How do I ensure the product complies with international building standards?
Compliance is critical for legal installation. You should request ISO 9001 certification for manufacturing quality and CE marking for European markets. For specific regions, check for ASTM (US) or AS/NZS (Australia/New Zealand) standards regarding wind load resistance (should withstand Level 10-12 winds) and seismic resistance (typically Grade 7-8). Always ask for third-party structural calculation reports.
What customization options are typically available for B2B buyers?
Most professional suppliers on Made-in-China.com offer modular flexibility. This includes internal layout adjustments, choice of exterior wall cladding (such as PVC, wood-plastic composite, or metal carved panels), and integrated pre-installed electrical and plumbing systems that follow your country's specific voltage and pipe standards. CAD and 3D modeling support is a hallmark of a high-quality supplier.
What is the expected lifespan and maintenance requirement for these houses?
A high-quality prefabricated integrated house has a design lifespan of 20 to 50 years, depending on the environment. Maintenance is relatively low; however, it is essential to inspect the waterproof sealant joints every 3-5 years and ensure the anti-corrosion coating on the base frame remains intact. Choosing fluorocarbon paint finishes can significantly extend the exterior color's vibrancy.
Cross-Border Procurement & Logistics Strategy
What are the primary risks when importing prefabricated houses and how can they be mitigated?
The biggest risks are shipping damage and missing components. To mitigate this, insist on professional sea-worthy packaging (steel pallets or reinforced crates). Use Trade Assurance services on Made-in-China.com to secure your payment. Furthermore, hire a third-party inspector (like SGS or Intertek) to conduct a loading supervision to ensure every bolt and panel listed in the packing list is actually inside the container.
How should I handle the logistics and assembly of a bulk order?
Prefabricated houses are usually shipped in SOC (Shipper Owned Containers) or as Flat-packs to optimize space. A 40ft HQ container can typically hold 6-8 standard container house units. Ensure the supplier provides detailed installation videos and manuals. For large-scale projects, negotiate for the supplier to send a technical engineer on-site or provide real-time remote video guidance during the first phase of assembly.
What negotiation strategies work best with integrated house manufacturers?
Focus on the Total Landed Cost rather than just the unit price. Negotiate for spare parts (extra glass, sealants, and touch-up paint) to be included at no cost. If ordering in volume, request a staged payment plan (e.g., 30% deposit, 40% after production, 30% after inspection but before shipping) to maintain leverage over quality control.
How do I navigate international trade policies and customs duties for this category?
Check the HS Code (typically 940690) for 'Prefabricated Buildings' in your country's tariff schedule. Be aware of anti-dumping duties that may apply to steel structures in certain regions. Always ensure the supplier provides a Certificate of Origin (CO), such as Form E or Form F, which can significantly reduce or exempt import duties under various Free Trade Agreements.





























